Bulgaria
How M2 Group scaled capacity to 150 windows per day with automated production lines
Window Manufacturer · 30+ employees · 3200 sq.m. facility
“Moving to two automated production lines required software that could manage them flawlessly. With RA Workshop, we optimized cutting and machine control, allowing us to reach our maximum production capacity of 150 windows per day with minimal waste.”
Managing Director, M2 Group
150
Windows per day
2
Automated production lines
−25%
Material waste reduction
Real fabricators. Real numbers. Real results.
Three customers picked from across the RA Workshop family — one solo installer, one mid-sized fabricator, one regional manufacturer.
30-day money-back
No credit card needed
Free 30-day trial
Bulgarian-speaking support

